Please rate the model / article by clicking on the asterisk. Thank you!

Dimensions: 34/36 (40/42)

You will need: 400 (500) in white (color 15) SECONDO LANA GROSSA yarn (55% cotton, 25% polyamide, 20% silk, 125 m / 50 g); Hook number 3.5.

Square motif (4 x 4 cm): knit according to the scheme and circle. R. Run a chain of 8 remuneration. n., close 1 compound. Art. In the ring and tie his circle. R. according to the scheme. For the 1st r. The motives from the 2nd motive neighboring arcs from the Wards. p. Connect 1 compound. Art., see the scheme of V. Ko 2-M. Motifs move respectively.

Openwork pattern:knit according to the scheme in direct and reverse rows. In the 1st p. Perform the 1st Art. B / N in the 2nd Wards. n. from the hook. For a shelf size of 34/36, all loops are indicated, for size 40/42, repeat the rapport allocated by light gray. Start with 3 remuneration. p. Walking instead of the 1st Art. s / n. From the 3rd r. knit S / H in the Wards. n. previous r. Run the 1st - 10th r. 1 time. 2nd r. Openwork stripes to carry out the same principle, and from the 12th to the 21st r. knit without a set on an existing curb. The 3rd strip of the openwork pattern knit the same as the 2nd, 33rd - 36th r. Run 1 time, repeat the 35th and 36th r.

Pattern of openwork arcs:knit according to the scheme in straight and reverse rows from the 22nd r. 22nd r. knit over the 2nd strip of an openwork pattern. For a shelf size of 34/36, all loops are indicated on the diagram, for size 40/42, repeat the selected light-gray rapports. Start with remote. P. The lift marked in the diagram. From the 24th r. Art. C / N and Art. B / n knit in the remuneration. P.Previdy r. Run the 22nd - 31st p. 1 time.

Edge from Art. C / N and Pico: Knit according to the C. Starting with the loops before the 1st arrow, repeat the rapport, end with loops after the 2nd arrow. Run the 1st and 2nd r.

Knitting density: openwork pattern: 9 rapports \u003d 27 p. And 9 p. \u003d 10 x 7 cm, 2 rapport and 9 p. \u003d 7 x 7 cm.

Left shelf:dial 53 (65) WIT. P. + 1 Rev. p. The lifting and perform an openwork pattern \u003d 1U (21) rapport. Through u cm \u003d 10 r. Work to postpone. Then perform floral borders of 2 x 5 (6) motifs. Then execute the 11th r. from Art. B / n according to the scheme over the openwork pattern (for size 40/42 per 1 motive). At the end of the 11th r. On the left side to perform according to the scheme of Art. B / N and WE p., then bind the opposite side of the motives and on the right side to attach the thread again at the beginning of the 11th r. 1 compound. Art. Then tied up the top edge of the motifs of the 2nd openwork strip from the 12th to the 21st p. Next, draw a pattern from openwork arcs \u003d 5 (6) rapports. After

31st r. Work to postpone and execute the 2nd Floral Border out of 5 (6) motifs. Take it down on the edge of the same way as the 1st border of the 32nd p. according to the scheme. Then from the 33rd r. Perform only openwork pattern. After 9 (11) cm \u003d 11 (13) p. From the curb to perform the neck cutout on the left side. For this purpose. izn. R. Skip the first 10 p. under Art. B / N, then in every 2nd p. Skip 1 x at p., 1 x 3 p. and 2 x 2 p.

under art. b / h. After 9 cm \u003d 11 p. From the beginning of the cutting of the neck, finish the shoulders at 9 (13) rapports.

Right shelf: knit symmetrically.

Back: Run a chain out of 104 (128) wealth. P. + 1 Rev. P. The lifting and knit in the sequence of the shelves patterns, in each pattern of the pattern, perform a double number of rapports and in flower borders to combine 10 (12) motifs among themselves. After 16 (18) cm \u003d 20 (22) p. From the last floral curb for the neckline of the neck to leave the average 14 rapports and knit further separately. From the edge for rounding in the trail. R. Skip more 1 rapport. After 2 cm \u003d 2 p. From the beginning of the cut from the outside, finish the shoulder \u003d 9 (13) rapports.

Sleeves: Run 6 (7) floral curbs, connect them between themselves over the angular loop 1 compound. Art. Then, for the lower edge of the sleeve, perform a chain of 63 (73) reasons. P. + 1 Rev. p. lifting and 1 r. Art. b / n, 1st art. Used to execute in the 2nd Wards. n. from the hook and flowers after the 1st Art. B / N, and then after each 10th century. b / n attach 1 compound. Art. To side loops. Work to finish. For the top of the sleeve, perform a chain of 83 (95) wealth. P. + 1 Rev. p. lifting and 1 r. Art. B / H, the opposite side of the motifs to connect in the corners: after the 1st Article. b / n, after the 12th century. B / N, then 5 times after each 14th p. (and 1 time after the 12th n.). Then perform the openwork pattern \u003d 27 (31) rapport, adding for bevels on both sides from the 3rd p. From the end of the border according to the scheme. This scheme indicates both edges to the last r., Rapport is highlighted in gray. After 20 cm \u003d 26 p. From the border work to finish.

Assembly:perform the seams, leave the side seams open to 18 (20) cm for the arm. The vertical edges of the shelves and the neckline of the neck to tie the edge with the pico and art. C / H (\u003d 3 rapport by 8 cm), 1st r. Out of Parties. Switch the sleeves.

Model and Description of knitting jacket with floral motifs from knitting your hobby magazine, special edition, crochet Extra, №3, 2016

Previous models from the section Mobile, Cardigans, Bluffs, Tops


Dimensions: 36/38 (40/42) You will need: 150 g of black (CV. 12) and white (CV. 15) Yarn Lana Grossa Secondo (55% cotton, 25% polyamide, 20% Silka, 125 m / 50 d); Hook number 4.


Sizes: S / M / L / XL You will need: 7/8/9/10 Motes Cream 541.841 Bergère de France Cotons Nature yarn (100% cotton, 190 m / 50 g); Hook number 3.5.

Most popular sweaters, cardigans, blouses, tops of the user estimates

Size 34-36 (Europe) You will need: 100% cotton (500 m / 100 g), hook number 2

Season: Summer.

Hook / knitting size / plugs: 1-2.

The composition of the yarn: cotton.

Crocheted double-breasted jacket with lapels combines both classic style and original forms that emphasize your femininity. The size 44-46

Materials: 200 g x / b yarn (425 m x 100 g) of milky gray and 200 g yarn (flax 70%, cotton 30%, 550 m x 100 g) orange, 25 g white for middle of motifs and cords; Hook number 1.5.

Jacket knitting description:

The model consists of individual motifs interconnected in the process of knitting. Before you start work, make the pattern of parts in a large value, adjusting in your standards. According to the scheme, perform a sample of the main motive and check it for compliance with the dimensions specified in the figure. If you need to increase (decrease) the sample, take a hook of greater (smaller) thickness. First, knit the main motifs, connecting among themselves in places marked with arrows, as shown in the diagram. For which instead of the average VP "Pico" from 3 VP, knit a connecting column in the middle VP symmetric arch of the neighboring motif.

Location of motives, see schematic drawing. Empty gaps fill in connecting motifs. In places marked by two arrows, instead of the middle VP "Pico", knit C1N with the total vertex in the middle VE of the two nearest Pico. To form a collar, tie one hexagonal motive based on the baseline scheme. Use the Crawler cords as strips. On the bottom of the sleeves and edges of the product, perform a tambourine of an orange yarn.

The size: 38-40

You will need:

  • iris yarn (100% cotton, 150m / 25g) - 50 g of orange, blue, pink, light-salad, green and green, and 10 g of light orange melange color,
  • yarn "Tenderness" (47% cotton, 53% viscose, 400 m / 100 g) - 20 g of blue,
  • hook №1,7, №2,
  • blue button buttons - 4 pcs.

Attention! Before you start work, do a natural value. All details knit in terms of crochet №1.7. Motive "Flower of 6 petals": knit according to Scheme 1.

Motive "Flower of 3 petals ": Knit according to Scheme 2.

Motive "Listic": Knit according to the scheme 3. To lengthen the leaf, repeat 1 or 2 times the 3rd row. For a residence, tie in the middle in the direction from top to bottom 1 series of compound. Art.

Motive "Circle": Bug in scheme 4.

Knit the motifs of colors and leaves according to the schemes, laying them on the pattern of the backs, shelves and sleeves and connecting each other. At large intervals, the intervals between motifs can be connected by the "circle" with a chain from the War. P.

Description of knitting jacket

Assembly:

Perform the shoulder seams, the sleeves. The bottom of the sleeves are tied with crochet number 2 with rows of art. b / n, bottom backs and shelves, neckline - 3 rows of art. B / N, the planks are also reinforced by crochet number 2 4 rows of Art. B / N, while on the right side on the right side, perform 4 loops for buttons. Encepting buttons on the right bar.

The size: 36/38
You will need: 600 g Violet CLOU Yarn (75% sheep wool, 25% polyacryl, 85 m / 50 g): Hooks No. 5 and No. 6: Decorative clasp.
Attention! The back and wands are made of floral motifs by pattern. Arrow on the pattern - direction of knitting.

Flower motif: For the motive, tie a chain of 6 remuneration. p. And to close it 1. Art. In the ring. Next, knit circular rows according to the scheme 1. Run 1 time the 1st and 2nd p. Connect the motifs among themselves in the last row of Art. b / n.
Relief pattern: The number of loops is multiple 4 + 2 + 3 remuneration. p. lift. Knit according to the scheme 2. Start with loops before rapport, repeat the loop of the Rapport, end with loops after the rapport. Run 1 time from the 1st to the 3rd r., Then repeat the 2nd and 3rd r.
Knitting density. Floral motif \u003d 11 x 11 cm: Relief pattern: 10.5 p. And 5.5 p. \u003d 10 x 10 cm.

Back and shelves: Crochet number 6 Tie 30 floral motifs and combine them into a rectangle out of 10 motifs in width and 3 motifs in height. Then, for the upper parts of the shelves and backs of crochet number 6, tie 10 motifs and attach them around the pattern.

Sleeves: Tie a chain out of 42 orders. p. + 3 Rev. p. Walking and knit with a relief pattern. After 43.5 cm \u003d 24 p. From the set of the edge of the work to finish.

Collar: Tie a chain of 18 remuneration. P + 3 RED. p. lifting and knit rehensier pattern. After 131 cm \u003d 72 p from the set of the edge of the work to finish.

Assembly: perform hostess seams; Connect the upper edge of the sleeves from the seam by 11 cm with floral motifs of the Proucy, the average 18 cm of the upper edges of the sleeves remain open. Send the average 41 cm of the right long edge of the collar to the upper edge of the back, while evenly add floral motifs until the collar size. The next 18 cm on both sides of the long edge of the collar to sew to the open edges of the sleeves. The external 27 cm on both sides of the long edge of the collar to sew to the upper edges of the shelves, while evenly add floral motifs until the collar size. All edges to tie down with crochet number 5 1 r. ST B / N and 1 p. "Rachi Step" (art. b / n left right), while in the 1st p. Perform the embossed pattern in chicks alternately 1 x 1 and 1 x 2 tbsp. b / n. In the edge of each flower motive 13 st. b / n, and in the corners of the shelves and collar tie 2 tbsp. b / n 1 p. Base.

Dimensions: 38-42

You will need: yarn (70% alpaca wool, 30% polyamide; 225 m / 50 g) - 250 g sulfur, 150 g pink, 100 g of light gray and 50 g of berry; Hook number 5.

Square: Folded 1 ring from the thread, execute 1 V.P. 6 tbsp. B / N in the ring and close the circular row with 1 compound. Art. (\u003d 1st circular row). Continue the work of Sogl. Crochet pattern knitting pattern circular rows. Each circular row to start smogl. Scheme with 3 initial V.P. instead of the 1st Art. S / N and finish 1 compound. Art. In the last initial 8.p. If necessary, move to the beginning of the next circular row with the help of compound. Art. Perform 1 time 1-5th circular rows.

Flower sequence 1:1st + 2nd Circular rows of light gray, 3rd circular row of berry, 4th round row row, 5th circular row gray thread.

Flower sequence 2: 1st + 2nd circular rows of light gray, 3rd circular row of pink, 4th circular row of light gray, 5th circular row of gray thread.

Flower sequence 3: 1st + 2nd round rows of pink, 3rd circular row of light gray, 4th round row of berry, 5th circular row of gray thread.

Sequence of colors 4: 1st + 2nd Circular rows of gray, 3rd round row row, 4th round row of light gray, 5th circular row of gray thread.

Flower sequence 5: 1st + 2nd circular rows of berry, 3rd round row row, 4th round row of light gray, 5th round row of gray thread.

Flower sequence 6: 1st + 2nd Circular rows of pink, 3rd circular row of gray, 4th round row row, 5th round row of gray thread.

Knitting density: Square \u003d 10 x 10 cm.

Work description: Perform the 19 squares of the Sughdle. Each sequence of colors (\u003d 114 squares) and sew them. Pattern, choosing the colors of squares at will.

Assembly:for the planks, bind the lower edges of the sleeves with a gray thread, to make a thread on the outer corner of the square using 1 compound. Art. Arrow A and continue the work of Sogl. Crochet (green icons) pattern circuit.

Perform 1 time 1-8th rows, then constantly repeat the 7th + 8th rows, while in the 1st circular row of the repeat, evenly distributed, to penetrate 6 x 2 tbsp. C / N together, in the 4th row to plunge 4 x 2 tbsp. s / n together. With a width of the plank, 13 rows finish work. Perform side seams and seams of sleeves. The lower edge of the jacket, the side of the shelves and the neck to one taking to tie the gray thread as follows: 1st circular row: like a 1st row of green icons in the diagram. 2nd circular row: compound. Art. Circular rows Click using 1 compound. Art. respectively.


Pattern
Crochet motifs knitting
size table